Since we were in Springville 6 days ago a lot has happened. Even though it doesn't look like much on the outside, a lot has been done on the inside. When Chris told me what the next steps were going to be, I assumed it was going to take about 2 weeks. Silly me. When we went to go see the progress yesterday (which was only 5 days after we last saw the house) we noticed a lot had been done. As said in my last post, we have shingles on the roof, we have all of the electrical done, and we have the HVAC system in as well.
Side note: Chris had to educate me on what HVAC was. So another lesson for those of you who don't know what it stands for. . .
Heating,
Ventilation, and
Air
Conditioning. That means that they got the all done in 3 1/2 days. Because we went down around 2:00 yesterday afternoon and the only people that were there were 2 men sweeping our sidewalks. I can't believe how quickly these men work. They must have an incredible system down in order to work this fast. That is the only explanation for it. Chris wasn't too surprised. He said, "If they can frame our entire house in 4 days, why wouldn't they be able to get all of the other stuff done in 3?" Good point.
|
This is the door knob on our garage. We are thinking this is what our hardware will look like. |
|
The can lighting in the kitchen. |
|
One of vents. I get excited over little things. |
|
Our HVAC headquarters. |
This means that dry wall will be going up soon. We are thinking next week. I can't believe we have most of a house.
As another side note: Tomorrow we will have only 45 days left. We are now half way.